Plan. Execute. Document. All in one place.

STYYR Automation replaces the spreadsheets, the notebooks and the evenings spent reconstructing the day. Schedule projects, assign engineers and document during the project, not after. Every installation keeps its full service history, ready for the next visit.

Follow a day on the job
A Windows application. Works without coverage.
How it works

From planning to completion.

The office creates the project and picks the engineers. Everyone sees what, where and how, with the installation's full history at hand. On site, the engineers log the work as it happens, and the customer signs before they leave. The report is filed on the installation, ready for whoever comes next. This example follows one day of a retrofit on a vessel.

Nordic AuroraNordic Aurora BWTS RetrofitPlanned 06:00
New project
Project nameNordic Aurora BWTS Retrofit
VesseloptionalNordic Aurora
CustomeroptionalNordhav Offshore AS
Typepick every kind of work the job covers
RemoteOnshore ServiceOffshore ServiceSea TrialCommissioningRetrofit
Team
JLJ. LorentzenLead
To dopoints a report can copy into Planned work
Replace control cabinet CP-01
Migrate the PLC program
CancelCreate project
24 Aug 2026— Monday11.5HRS
HoursNormalRate ARate B
06:00–09:30 Travel Mobilisation 3.5––
09:30–12:00 Onshore Cabinet inspection 2.5––
12:00–13:00 Waiting Waiting on yard 1.0––
13:00–17:30 Onshore PLC download 1.03.5–
Add hours
Enternext lineTabacross — nothing else to learn
Work description
1.1
Signed in with yard HSE, collected hot-work permit for deck 3 machinery space.
1.2
Inspected control cabinet CP-01 after transport. No transit damage.
Attachment 1×Spare fuse pack F12 missing×
1.3
What happened at this point of the day
Add line
Quick Notes2 waiting
IMG_4812.jpgToday 10:44 · photo
Spare fuse pack F12 missingToday 10:42 · note
13:00–17:30OnshorePLC program download and I/O loop check 1.03.5–

Customer

Is billed
Onshore · Normal1.0 h
Onshore · Rate A3.5 h
On the report

Technician

Is paid
Normal time1.0 h
Overtime3.5 h
Never on the report
Finished and locked. Corrections are new revisions.
REV 1Signed by customer representative26 Aug · 10:05
REV 2PO number added after the job02 Sep · 08:40
SR_20260826_NordicAurora_JLO.pdf — sent by email, so the email is the record
Filed on the vessel, for the next ten years

Planned at the office, ready before you leave.

Everything the team needs, set up in a minute.

  • Installation and customer connected
  • Team and lead assigned
  • Schedule set
  • To-do list created

Log your hours.

You log the hours. STYYR does the maths.

  • Hours as rows, automatically sorted
  • Travel made simple with time zone handling
  • Hour types set up to match your company
  • Rates calculated automatically

Photos and notes go where they belong.

Photos for the customer. Notes for the team.

  • Attached to the work they document, so nothing relies on memory
  • Photos automatically added to the report
  • Quick notes stay internal and follow the project
  • Open items carried over to the next visit

One entry. Two rulebooks.

Billable hours for the customer. Payable hours for the engineer.

  • Both rulebooks set up for your company
  • The customer sees the billable hours
  • The team sees the payable hours

Hand it over before you leave.

Signed on site. Filed for the next visit.

  • Locked once signed
  • Corrections become new revisions, never silent edits
  • Signed PDF, ready for your customer
  • Filed on the installation, with its full history
Coming soon · Phone app

Leave the laptop in the bag.

Log hours, add photos and notes, get project notifications and collect signatures. All in sync with your laptop.

Built in Norway, for the people who do the work.

The project

One place for the whole job.

A project holds the vessel or plant, the customer, the team, the plan, the to-do list and the notes taken on the job. The report draws on all of it, and the hours you log before the report exists wait there for it.

The document

One document the customer signs.

01Your logo and coloursThe PDF carries your company's identity, not ours.
02Locked once finishedSigned-off reports cannot be edited. Corrections are new revisions.
03Attachments by numberEvery photo is numbered and referenced where the work is described.
Try your colour
See a sample report
The installation remembers

The technician who comes back in five years starts from what was done.

Every report, punch list item, note and photo stays with the installation, across projects and customers. What the last visit left under actionable items is standing there, open, until a project closes it.

Bergvik process plant · Line 2Service history · example
2021
Commissioning

Control system delivery.

Actionable itemsNone left open
2023
Service on site

I/O card replaced after alarm fault on the control system.

OpenedMissing spare fuses for control system.
2024
Remote

HMI modifications and backup.

Still openMissing spare fuses for control system.
2026
Retrofit

PLC and HMI upgrade.

Closed by this projectSpare fuses installed in control system.

Example data. One installation, four visits, one open item that nobody had to remember.

Get started

Try it on the next job.

A Windows application, installed in seconds and updated automatically. We set up your company with you, load your vessels, plants and customers, invite your people, and the first report is written together.

Windows 10 or 11, 64-bit · Licensed per company with a seat per technician · Price on request